IN THE PICTURE
The turbines have been erected
The last leg of the journey
The components for the 150 Siemens turbines are supplied from all over Europe. The prefabrication ultimately leads to a number of large elements that are assembled on-site. An amazing achievement, given the size and weight of the elements and the dynamic of the North Sea. But they’re in position now. A real joint effort.